
GP 3800A Operation
25
5.6 Grounding the Generator
See Graphic: wc_gr000544
A ground connection (a) is located on the generator frame. For proper
operating safety, this ground terminal must be connected to a good
ground source. This ground connection must comply with National
Electrical Code standards, and state and local regulations.
5.7 Operating Heavy Loads
Limit operations requiring the maximum rated output of 3800 W to 20–
30 minutes. For continuous operation do not exceed the continuous
rated output of 3400 W.
NOTICE: DO NOT exceed the current limit specified on the control
panel for any receptacle.
Kommentare zu diesen Handbüchern