Wacker Neuson BTS 635s Betreibershandbuch Seite 51

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 80
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 50
BTS 630, 635 10 Maintenance
Operator's manual 51
Note: For EPA machines (in the USA and Canada), have the exhaust port of the
machine cleaned by the service team of your Wacker Neuson contact
every 90 h.
10.3 Maintenance work
Working in the workshop
Perform maintenance work in a workshop on a workbench. This has the following
benefits:
Protection of the machine of contamination on the construction site.
A level and clean work surface makes work easier.
There is a better overview over small parts and they are not lost as easily.
10.3.1 Cleaning the machine
f Wipe the housing with a damp and clean cloth.
10.3.2 Topping up with fuel
Performing preparations
1. Switch off the engine.
2. Let the machine cool off.
3. Position the machine on its side such that the fuel cap points up.
4. Remove any dirt around the fuel cap.
* In case of loss in engine performance, shorten maintenance intervals.
WARNING
Hazard of fire and explosions by fuel and fuel vapors.
f Do not smoke.
f Do not refuel near open flames.
f Turn off the engine before refueling and allow it to cool down.
CAUTION
Health hazard due to fuel.
f Refuel in a well-ventilated environment.
f Do not inhale fuel vapors.
f Avoid skin and eye contact with fuel.
Seitenansicht 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 79 80

Kommentare zu diesen Handbüchern

Keine Kommentare