Wacker Neuson BTS 635s Betreibershandbuch Seite 39

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 80
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 38
BTS 630, 635 8 Initial start up
Operator's manual 39
Mounting the cutting attachment on the outside
1. Remove the cutting attachment.
2. Clean the cutting attachment, V-belt pulley, belt guard and screws.
3. Rotate the cutting attachment 180° and place it in position.
4. Place the V-belt in position.
5. Place the belt guard in position and affix it with screws.
6. Rotate the adjusting screw clockwise until the square nut is located between
the two marks.
7. Tighten the belt guard screws.
Torque 25 Nm.
8. Position the hose connections and tighten them.
Item Designation Item Designation
1 Hose connection (2 pieces) 3 Adjusting screw
2 Belt guard 4 Screw (2 pieces)
Seitenansicht 38
1 2 ... 34 35 36 37 38 39 40 41 42 43 44 ... 79 80

Kommentare zu diesen Handbüchern

Keine Kommentare