HI 110 / 200 / 300 Operation
ghi_tx001447gb.fm 31
4.12 Starting the Machine
Requirements
Machine properly positioned
Power connected
Pre-Starting Checks completed
Procedure
To start the machine, follow the procedure below.
1. Select an operation mode.
a.Continuous heat mode (I)
b.thermostat mode (II)
Operational
sequence
The following sequence of events will occur.
1. The blower will start.
Nozzle heater
Note: The burner may not fire immediately on startup if the nozzle is cold. HI 200
HD and HI 300 HD machines are equipped with an additional heater that warms
the nozzle to the required operating temperature. After you select the ON (heat)
mode, the nozzle preheating sequence may cause a delay of up to 6 minutes
before the burner fires.
2. The burner will start firing.
If a remote thermostat is not being used, the burner will fire continuously.
In applications in which the remote thermostat is being used, the burner will fire
until the air temperature of the application area reaches the target temperature
set by the remote thermostat. At that time, the burner will shut off, but the blower
will continue to operate. When the air temperature of the application area falls
below the target temperature set by the remote thermostat, the burner will refire.
The process continues as long as there is fuel for the burner.