Wacker Neuson EHB 10 series Betreibershandbuch Seite 37

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 54
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 36
EHB 11 Maintenance
37
8 Maintenance
8.1 Maintenance schedule
WARNING
Improper handling can result in injury or serious material damage.
f Read and follow all safety instructions of this operator's manual, see chapter
Safety information.
Task Daily be-
fore oper-
ation
Every
20 hrs.
Monthly
Check power cable for perfect
condition – if power cable is
defective, have it replaced. *
* Have the machine repaired by your WACKER representative.
Visual inspection of all parts
for damage.
Clean the machine.
Check shanks and cutting
edges of tool – sharpen, re-
forge or replace as needed.
Lubricate crank mechanism.
Check tool holder for wear –
have it changed, if
necessary. *
Seitenansicht 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 53 54

Kommentare zu diesen Handbüchern

Keine Kommentare